content shadow

Comment Response Documents (CRDs) and Review Groups

Agency Rulemaking Process

Click here for an illustration of the full Rulemaking Procedure

Comment Response Documents document the feedback received during the Consultation phase (or Notice of Proposed Amendment phase) of the Rulemaking Procedure. They provide explanatory notes on the Consultation phase, and provide the Agency's response to this feedback. They are published here for a given Comments and Review period (phase 5) which ends on the Closing Date of Publication. After this phase, the Rulemaking Procedure enters the Adoption and Publication phase, after which non-active CRDs and accompanying comments are published within the Rulemaking Archive.

The Agency has developed a Comment Response Tool (CRT) that is used to automate the consultation process for Notices of Proposed Amendments (NPA) and Comment-Response Documents (CRD). The CRT allows users to review NPAs and place their comments, and to view the CRDs and add their reactions before the publication of the final Decision or Opinion.

Reactions to CRDs must be submitted using the CRT. In case the use of CRT is prevented by technical problems these should be reported to the webmaster and comments sent by email instead. To access the CRT go to http://hub.easa.europa.eu/crt/

CRD Table
CRD # Title Date Closing date Reaction form
CRD 2007-09 Part-145 single and multiple releases 05/08/2010 05/10/2010 Please place reactions using the CRT
CRD 2008-07a “ELA process” and “standard changes and repairs” and for introducing an Executive Director Decision on certification specifications and acceptable means of compliance, for Light Sport Aeroplanes
(« CS-LSA »)
15/07/2010 15/09/2010 Please place reactions using the CRT

Comment Response Documents requiring an extended period for publication

As stated in article 7.4 of the EASA Management Board Decision concerning the procedure to be applied by the Agency for the issuing of opinions, certification specifications and guidance material, referred to as the "Rulemaking Procedure", the Agency is required to publish an amended timetable for those specific tasks where a Comment Response Document (CRD) cannot be published in the web site within three months after the original expiry date set for commenting on the NPA. Equally an amended timetable must be indicated for the publication of the CRD. The following list contains such tasks:

Comment Response Documents requiring an extended period of publication

Review Groups

According provision III.a of the "Procedure for the determination of the membership of rulemaking groups", a review group is a drafting group augmented of two members. One shall be a person involved in standardisation inspections in the domain affected by the task of the group. The other person shall be chosen to ensure that dissenting views, as they appear in the consultation, are duly represented in the review of comments and the drafting of the final proposal of the group.
This section contains the final composition of the review groups after the opinion of the Safety Standards Consultative Committee and the Advisory Group of National Authorities.

NPA Review Groups table
NPA Review Group Composition Status Title Publication date Related NPA
NPA Review Group ToR 21.042 active Part-21 Other party supplier control 19/07/2010 2010-01
NPA Review Group ToR OPS.001 (Aerial Work) Issue 2
active Extension of the Basic Regulation to Air Operations - Aerial Work 12/02/2010 2009-02a
2009-02b
2009-02c
2009-02d
2009-02e
2009-02f
2009-02g
2009-02g1
NPA Review Group ToR OPS.001 (Commercial Air Transport) active Extension of the Basic Regulation to Air Operations - Commercial Air Transport 18/01/2010
NPA Review Group ToR OPS.001(Non-commercial operations with complex motor-powered aircraft)
active Extension of the Basic Regulation to Air Operations - non-commercial operations with complex motor-powered aircraft 18/01/2010
NPA Review Group ToR OPS.001 (Non-commercial operations with other than complex motor-powered aircraft) active Extension of the Basic Regulation to Air Operations - non-commercial operations with other than complex motor-powered aircraft 18/01/2010

NPA Review Group ToR MDM.003(a)

active Flight Testing 11/01/2010 2008-20
NPA Review Group ToR OPS.001 and FCL.001

SubGroup ATO-FCL to Review Group ToR OPS.001 and FCL.001
active

active
Authority Requirements and Organisation Requirements

Authority Requirements and Organisation Requirements - Subparts ATO, FCL
17/12/2009

08/06/2010
2008-22a
2008-22b
2008-22c
2008-22d
2008-22e
2008-22f
NPA Review Group ToR 21.039(a) active Elaboration and adoption in the Community framework, of additional airworthiness specifications for a given type of aircraft and type of operation 24/09/2009 2009-01
NPA Review Group ToR FCL.001 active Extension of the Basic Regulation to flight crew licensing 31/03/2009 2008-17a
2008-17b
2008-17c
NPA Review Group ToR VLA.004 task closed Exits 30/09/2008 2008-11
NPA Review Group ToR MDM.001 active Extended Range Operations with Two-Engined Aeroplanes ETOPS Certification and Operation (AMC 20-6) 28/08/2008 2008-01
NPA Review Group ToR 21.023(b) active Restricted Type Certificates / Restricted Certificates of Airworthiness 21/08/2008 2008-06
NPA Review Group ToR 25.015&016 active Engine & APU Failure Loads and Sustained Engine Windmilling 30/07/2008 2007-15
NPA Review Group ToR 25.040 active Type III Emergency Access and Ease of Operation 29/07/2008 2008-04
NPA Review Group ToR 66.006 active Privileges of B1 and B2 aircraft maintenance licenses 19/05/2008 2007-07
NPA Review Group ToR 66.009 active Type and group ratings 19/05/2008 2007-07
NPA Review Group ToR 66.011 active Type training 19/05/2008 2007-07
NPA Review Group ToR 145.012 active Single/multiple releases 19/05/2008 2007-09
NPA Review Group ToR MDM.007 task closed Authorised Release Certificate EASA Form 1 12/02/2008 13/2007
NPA Review Group ToR 66.004 task closed Time limit for demonstrating compliance with knowledge and experience requirements 13/12/2007 02/2007
NPA Review Group ToR M.005
NPA Review Group ToR M.017
task closed Revised Part-M requirements for aircraft not used in Commercial Air Transport and Pilot owner maintenance 23/11/2007 08/2007
NPA Review Group

task closed

Hot Air Balloons 15/02/2007 07/2006
NPA Review Group

task closed

Permit to Fly / Restricted Certificates of Airworthiness 27/09/2006 09/2006
NPA Review Group

task closed

Human Factors 05/07/2005 15/2004
NPA Review Group

task closed

Miscellaneous Improvements to CS-E 06/09/2005 03-2005 and 04-2005